Target Rochester

Rochester, NY


Post

DESCRIPTION

Target Stores, Inc constructed a 127,000 sf retail store at the Medley Centre shopping mall. The project site was the location of a former industrial plant building.

CHALLENGE

Old foundations and slabs were encountered on the northern half of the building footprint. Debris laden fill underlain by clean sand fill was encountered at depths ranging from 12 to 25 ft.

SOLUTION

Rapid Impact Compaction (RIC) ground improvement was used to densify the various fill materials and provide a uniform subgrade for the Target foundations and floor slab. Depending on weather conditions, production rates ranged from 4500 to 7500 sf per day. The use of RIC eliminated the need for over-excavation and replacement keeping the fast track project on schedule and within budget in spite of the winter construction.

OWNER

Target Corporation

GENERAL CONTRACTOR

Western New York Contractors

GEOTECHNICAL ENGINEER

Atlantic Testing Laboratories (Developer) Foundation Design PC (Target)

PRODUCTS

Rapid Impact Compaction